Reference Source

Framing Inspection

For Framing Inspection, process is Residential building inspection sequence; jurisdiction is Creve Coeur, Missouri; order is 4; what must already be done is after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections; what may not proceed until it passes is No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official, recorded from its source on 2026-08-11.

Step
Framing Inspection verified
Process
Residential building inspection sequence our reading
Jurisdiction
Creve Coeur, Missouri our reading
Order
4 verified
What must already be done
after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections verified
What may not proceed until it passes
No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official verified
Sourcecrevecoeurmo.gov
Verified
Review by
DatasetWhat must pass before the next step: mandated step order in regulated processes

Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.

What the source says

4. Framing Inspection A framing inspection is required after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections. Also, all masonry walls, fireplace chimneys and vents and all framing; including the floor, wall and roof structures, firestopping, fireblocking, bracing and sheathing must be completed. No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official.

crevecoeurmo.gov, retrieved 2026-08-11

Sources disagree

More than one authority states this, and they do not state the same thing. Both are reproduced with the source each came from — deciding between them is yours, not ours.

Process

crevecoeurmo.gov says process is Residential building inspection sequence, as of 2026-08-11.

4. Framing Inspection A framing inspection is required after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections. Also, all masonry walls, fireplace chimneys and vents and all framing; including the floor, wall and roof structures, firestopping, fireblocking, bracing and sheathing must be completed. No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official.

https://www.crevecoeurmo.gov/86/Sequence-of-Inspections

crevecoeurmo.gov says process is Wood deck inspection sequence, as of 2026-08-11.

Framing Inspection: All structural members and connections, as well as the house / deck flashing must be inspected and approved prior to installation of deck material. Guard rail posts and stair stringers should be cut and installed prior to this inspection.

https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks

What must already be done

crevecoeurmo.gov says what must already be done is after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections, as of 2026-08-11.

4. Framing Inspection A framing inspection is required after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections. Also, all masonry walls, fireplace chimneys and vents and all framing; including the floor, wall and roof structures, firestopping, fireblocking, bracing and sheathing must be completed. No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official.

https://www.crevecoeurmo.gov/86/Sequence-of-Inspections

crevecoeurmo.gov says what must already be done is Guard rail posts and stair stringers should be cut and installed prior to this inspection, as of 2026-08-11.

Framing Inspection: All structural members and connections, as well as the house / deck flashing must be inspected and approved prior to installation of deck material. Guard rail posts and stair stringers should be cut and installed prior to this inspection.

https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks

What may not proceed until it passes

crevecoeurmo.gov says what may not proceed until it passes is No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official, as of 2026-08-11.

4. Framing Inspection A framing inspection is required after the plumbing, mechanical, electrical and fire rough-in inspections have been approved and noted on the posted Record of Inspections. Also, all masonry walls, fireplace chimneys and vents and all framing; including the floor, wall and roof structures, firestopping, fireblocking, bracing and sheathing must be completed. No mechanical, electrical, plumbing or framing systems may be concealed before this inspection is completed and approved by the building official.

https://www.crevecoeurmo.gov/86/Sequence-of-Inspections

crevecoeurmo.gov says what may not proceed until it passes is All structural members and connections, as well as the house / deck flashing must be inspected and approved prior to installation of deck material, as of 2026-08-11.

Framing Inspection: All structural members and connections, as well as the house / deck flashing must be inspected and approved prior to installation of deck material. Guard rail posts and stair stringers should be cut and installed prior to this inspection.

https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks