PPL(A)
For PPL(A), authority is EASA (European Union); provision is FCL.210.A(a)(2); requirement is solo cross-country; value is at least 5 hours of solo cross-country flight time; condition is with at least 1 cross-country flight of at least 270 km (150 NM), during which full stop landings at 2 aerodromes different from the aerodrome of departure shall be made, recorded from its source on 2026-08-10.
- Authority
- EASA (European Union) our reading
- Provision
- FCL.210.A(a)(2)
- Requirement
- solo cross-country our reading
- Value
- at least 5 hours of solo cross-country flight time verified
- Condition
- with at least 1 cross-country flight of at least 270 km (150 NM), during which full stop landings at 2 aerodromes different from the aerodrome of departure shall be made verified
Values marked our reading are our classification of what the source says — the source does not print them in those words. The quote below is the evidence for each one; judge it yourself.
What the source says
10 hours of supervised solo flight time, including at least 5 hours of solo cross-country flight time with at least 1 cross-country flight of at least 270 km (150 NM), during which full stop landings at 2 aerodromes different from the aerodrome of departure shall be made
— eur-lex.europa.eu, retrieved 2026-08-10
Source
- eur-lex.europa.euhttps://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32011R1178