Reference Source

Asbestos Abatement Notification Requirements, Thresholds, and Fees by State

Notification requirements for asbestos abatement and demolition projects vary by state. The federal NESHAP (40 CFR 61 Subpart M) requires 10 working days' notice for projects exceeding 260 linear feet, 160 square feet, or 35 cubic feet of regulated asbestos-containing material. States with delegated authority impose their own notification fees, advance-notice periods, material quantity thresholds, and exemptions. This table gives the notification trigger, advance-notice period, fee structure, and delegated authority for each state so a contractor knows what is required before starting work.

Records7
Sources7
Verified
Review by
Licenceunknown

The data

jurisdictiondelegated authoritynotification trigger thresholdadvance notice daysnotification feeresidential exemptionemergency notification rulesstatute or regulation citation
ConnecticutConnecticut Department of Public Health, Asbestos ProgramAll asbestos abatement projects require notification; all demolitions require notification even if no asbestos is presentat least ten (10) days$100.00 for abatement less than 160 square feet; $100.00 plus one percent (multiply cost by 0.01) of the total abatement cost (excluding cost to reinsulate) up to a maximum fee of $5,000.00 for abatement of 160 square feet or greater; $50.00 for demolition notification; $200.00 for alternative work practice applicationNo specific residential exemption stated in state notification fee schedule; follows federal NESHAP exemptionAn Emergency notification must be filed within one (1) working day. Contractors should discuss with program staff before proceeding with an emergency filing unless the facility poses an imminent risk of harming the public.Connecticut Department of Public Health Asbestos Program notification requirements
Federal (United States)EPA, with delegation available to state agencies under 40 CFR 61.04All demolitions regardless of asbestos amount; renovations at least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square feet) on other facility components, or at least 1 cubic meter (35 cubic feet) off facility componentsAt least 10 working daysNo federal feeFacility excludes residential buildings having four or fewer dwelling unitsAs early as possible before, but not later than, the following working day40 CFR Part 61, Subpart M
GeorgiaGeorgia Environmental Protection Division, Lead-Based Paint and Asbestos ProgramAll demolitions regardless of asbestos amount; any project involving ten (10) or more continuous linear feet or ten (10) or more square feet of asbestos-containing material for renovations/abatementten (10) working day$0.10 per square foot of friable asbestos-containing materials plus $0.10 linear foot of friable asbestos-containing materials, with a minimum of $25 for any project; but not to exceed $50 for any small project or residential dwelling project nor exceed $1,000 for any other projectLegal owners or residences where four (4) or fewer dwelling units are involved, unless part of a larger project, are exempt from demolition project notification requirementsNotification of the emergency situation should be submitted within 24 hours from the time of its occurrence, or from the time you are contacted with a request for emergency work to be performedGeorgia Department of Natural Resources Rules for Air Quality Control, Chapter 391-3-1-.02(9)(b)7; Georgia Rules of Asbestos Removal and Encapsulation, Chapter 391-3-14
IowaIowa Department of Natural ResourcesProjects subject to the requirements of the national emission standard for hazardous air pollutants (NESHAP) for asbestos10 working days (per federal NESHAP)$100 for each required original or each annual notification for each demolition or renovation, including abatementFollows federal NESHAP exemption for residential buildings having four or fewer dwelling unitsPer federal NESHAP emergency provisions567 IAC 23.2(3); Iowa Environmental Protection Commission rules adopted December 15, 2015
MinnesotaMinnesota Department of Health, Asbestos ProgramFriable ACM exceeding 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet; residential projects exceeding 10 linear feet, 6 square feet, or 1 cubic footfive (5) calendar days$35 permit fee for residential projects with friable ACM less than 160 square feet; 3% of total project cost for all other notifiable projectsResidential projects with friable ACM below 6 square feet, 10 linear feet, or 1 cubic foot are not notifiableContact MDH and MPCA as soon as possible to verify whether the project meets the requirements of an emergency projectMinnesota Statutes 326.71; Minnesota Rules 4620
TexasTexas Department of State Health Services, Asbestos Program (TAHPR)Renovation projects which include the disturbance of any asbestos-containing building material in a public building or the disturbance of the NESHAP threshold amount of asbestos-containing material in a facility; demolition of a building or facility, even when no asbestos is presentat least 10 working daysthe building owner is required to pay a notification fee that is based upon the amount of asbestos removed, with a minimum fee of $55.00 and a 3% subscription fee per original notificationOne private residence is not subject to the asbestos NESHAP regulations and notification is not requiredEmergency notifications may be submitted online or hardcopy by mail to the department no later than the following work day after the incidentTAHPR, Title 25 of the Texas Administrative Code, Chapter 295, Subchapter C, Section 295.61
VirginiaVirginia Department of Labor and Industry, Safety and Health Codes Boardany asbestos project of 10 linear feet or more or 10 square feet or more20 days$50 for each project equal to or greater than 10 linear feet or 10 square feet up to and including 260 linear feet or 160 square feet; $160 for each project of more than 260 linear feet or 160 square feet up to and including 2600 linear feet or 1600 square feet; $470 for each project of more than 2600 linear feet or 1600 square feet; blanket notification fee is 0.5% of the contract price or $470 whichever is greaterFollows federal NESHAP exemption for residential buildings having four or fewer dwelling unitsNotification and asbestos permit fee shall be submitted within five working days after the start of the emergency abatement; emergencies include protection of life, health, or property such as leaking or ruptured pipes, accidentally damaged or fallen asbestos16VAC25-20-30

Where this came from

Every record above links the page it was taken from and quotes the sentence that states it. These are the 7 sources this dataset was assembled from.

Machine-readable

7 records. last verified against source . due for re-check by .