# Washington — State construction defect statute of limitations and statute of repose periods For Washington, sol — contract (years) is 6; sol — tort (years) is 3; statute of repose (years) is 6; sor trigger event is substantial completion or termination of services; discovery rule is Yes, recorded from its source on 2026-08-18. - **State:** Washington _(our reading, not quoted from the source)_ - **SOL — contract (years):** 6 _(verified: appears in the quote below)_ - **SOL — tort (years):** 3 _(verified: appears in the quote below)_ - **Statute of repose (years):** 6 _(verified: appears in the quote below)_ - **SOR trigger event:** substantial completion or termination of services _(verified: appears in the quote below)_ - **Discovery rule:** Yes _(our reading, not quoted from the source)_ - **Statutory citation:** RCW §4.16.310 _(verified: appears in the quote below)_ ## What the source says > RCW §4.16.310 — 6-year SOR from substantial completion or termination of services. SOL 3 years for tort and 6 years for written contract from accrual or discovery. Washington applies a strong discovery rule with developed case law on envelope failures. ## Source - https://terrapincg.com/news/construction-defect-statute-of-limitations-by-state-2026 Last verified: 2026-08-18. Review by: 2027-08-18. Part of [State construction defect statute of limitations and statute of repose periods](https://referencesource.org/state-construction-defect-limitations-periods/).