# Final Inspection — What must pass before the next step: mandated step order in regulated processes For Final Inspection, process is Residential building inspection sequence; jurisdiction is Creve Coeur, Missouri; order is 7; what must already be done is after all required inspections are approved, including the final mechanical, electrical, plumbing and fire inspections, recorded from its source on 2026-08-11. - **Step:** Final Inspection _(verified: appears in the quote below)_ - **Process:** Residential building inspection sequence _(our reading, not quoted from the source)_ - **Jurisdiction:** Creve Coeur, Missouri _(our reading, not quoted from the source)_ - **Order:** 7 _(verified: appears in the quote below)_ - **What must already be done:** after all required inspections are approved, including the final mechanical, electrical, plumbing and fire inspections _(verified: appears in the quote below)_ - **What may not proceed until it passes:** The completed deck project must be inspected and approved prior to use _(per crevecoeurmo.gov, not stated by the source above)_ ## What the source says > 7. Final Inspection A final building inspection must be made after all required inspections are approved, including the final mechanical, electrical, plumbing and fire inspections. ## Sources disagree More than one authority states this, and they do not state the same thing. Both are reproduced with the source each came from. ### Process crevecoeurmo.gov says process is **Residential building inspection sequence**, as of 2026-08-11. > 7. Final Inspection A final building inspection must be made after all required inspections are approved, including the final mechanical, electrical, plumbing and fire inspections. Source: https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2 crevecoeurmo.gov says process is **Wood deck inspection sequence**, as of 2026-08-11. > Final Inspection: The completed deck project must be inspected and approved prior to use. Source: https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks ## Source - https://www.crevecoeurmo.gov/253/Sequence-of-Inspection-Page-2 - https://www.crevecoeurmo.gov/87/Sequence-of-Inspections-for-Wood-Decks Last verified: 2026-08-11. Review by: 2027-08-11. Part of [What must pass before the next step: mandated step order in regulated processes](https://referencesource.org/prerequisite-sequencing-regulated-processes/).