# Mill Pond Hydro — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For Mill Pond Hydro, eia plant id is 65399; generator id is U2; planned retirement year is 2027; planned retirement month is 6; operator is Rivers Electric, LLC, verified against its source on 2026-08-11. - **Plant:** Mill Pond Hydro _(verified: appears in the quote below)_ - **EIA plant ID:** 65399 _(verified: appears in the quote below)_ - **Generator ID:** U2 _(verified: appears in the quote below)_ - **Planned retirement year:** 2027 _(verified: appears in the quote below)_ - **Planned retirement month:** 6 _(verified: appears in the quote below)_ - **Operator:** Rivers Electric, LLC _(verified: appears in the quote below)_ - **EIA entity ID:** 64726 _(verified: appears in the quote below)_ - **Producer type:** IPP _(verified: appears in the quote below)_ - **State:** NY _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 0.5 _(verified: appears in the quote below)_ - **Technology:** Conventional Hydroelectric _(verified: appears in the quote below)_ - **Fuel code:** WAT _(verified: appears in the quote below)_ - **Prime mover:** HY _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2027 | 6 | 64726 | Rivers Electric, LLC | IPP | Mill Pond Hydro | NY | 65399 | U2 | 0.5 | Conventional Hydroelectric | WAT | HY | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).