# Linden Solar Farm — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For Linden Solar Farm, eia plant id is 57381; generator id is LIND; planned retirement year is 2030; planned retirement month is 12; operator is Public Service Elec & Gas Co, verified against its source on 2026-08-11. - **Plant:** Linden Solar Farm _(verified: appears in the quote below)_ - **EIA plant ID:** 57381 _(verified: appears in the quote below)_ - **Generator ID:** LIND _(verified: appears in the quote below)_ - **Planned retirement year:** 2030 _(verified: appears in the quote below)_ - **Planned retirement month:** 12 _(verified: appears in the quote below)_ - **Operator:** Public Service Elec & Gas Co _(verified: appears in the quote below)_ - **EIA entity ID:** 15477 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** NJ _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 2.7 _(verified: appears in the quote below)_ - **Technology:** Solar Photovoltaic _(verified: appears in the quote below)_ - **Fuel code:** SUN _(verified: appears in the quote below)_ - **Prime mover:** PV _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2030 | 12 | 15477 | Public Service Elec & Gas Co | Electric Utility | Linden Solar Farm | NJ | 57381 | LIND | 2.7 | Solar Photovoltaic | SUN | PV | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).