# Brighter Future Solar — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For Brighter Future Solar, eia plant id is 64910; generator id is BFSNC; planned retirement year is 2052; planned retirement month is 1; operator is Brighter Future Solar LLC, verified against its source on 2026-08-11. - **Plant:** Brighter Future Solar _(verified: appears in the quote below)_ - **EIA plant ID:** 64910 _(verified: appears in the quote below)_ - **Generator ID:** BFSNC _(verified: appears in the quote below)_ - **Planned retirement year:** 2052 _(verified: appears in the quote below)_ - **Planned retirement month:** 1 _(verified: appears in the quote below)_ - **Operator:** Brighter Future Solar LLC _(verified: appears in the quote below)_ - **EIA entity ID:** 64390 _(verified: appears in the quote below)_ - **Producer type:** IPP _(verified: appears in the quote below)_ - **State:** NC _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 11.0 _(verified: appears in the quote below)_ - **Technology:** Solar Photovoltaic _(verified: appears in the quote below)_ - **Fuel code:** SUN _(verified: appears in the quote below)_ - **Prime mover:** PV _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2052 | 1 | 64390 | Brighter Future Solar LLC | IPP | Brighter Future Solar | NC | 64910 | BFSNC | 11.0 | Solar Photovoltaic | SUN | PV | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).