# Marceline — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For Marceline, eia plant id is 7470; generator id is 1; planned retirement year is 2027; planned retirement month is 12; operator is City of Marceline - (MO), verified against its source on 2026-08-11. - **Plant:** Marceline _(verified: appears in the quote below)_ - **EIA plant ID:** 7470 _(verified: appears in the quote below)_ - **Generator ID:** 1 _(verified: appears in the quote below)_ - **Planned retirement year:** 2027 _(verified: appears in the quote below)_ - **Planned retirement month:** 12 _(verified: appears in the quote below)_ - **Operator:** City of Marceline - (MO) _(verified: appears in the quote below)_ - **EIA entity ID:** 11626 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** MO _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 1.0 _(verified: appears in the quote below)_ - **Technology:** Petroleum Liquids _(verified: appears in the quote below)_ - **Fuel code:** DFO _(verified: appears in the quote below)_ - **Prime mover:** IC _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2027 | 12 | 11626 | City of Marceline - (MO) | Electric Utility | Marceline | MO | 7470 | 1 | 1.0 | Petroleum Liquids | DFO | IC | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).