# Northeast (WA) — Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before For Northeast (WA), eia plant id is 6210; generator id is 1; planned retirement year is 2035; planned retirement month is 12; operator is Avista Corp, verified against its source on 2026-08-11. - **Plant:** Northeast (WA) _(verified: appears in the quote below)_ - **EIA plant ID:** 6210 _(verified: appears in the quote below)_ - **Generator ID:** 1 _(verified: appears in the quote below)_ - **Planned retirement year:** 2035 _(verified: appears in the quote below)_ - **Planned retirement month:** 12 _(verified: appears in the quote below)_ - **Operator:** Avista Corp _(verified: appears in the quote below)_ - **EIA entity ID:** 20169 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** WA _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 45.0 _(verified: appears in the quote below)_ - **Technology:** Natural Gas Fired Combustion Turbine _(verified: appears in the quote below)_ - **Fuel code:** NG _(verified: appears in the quote below)_ - **Prime mover:** GT _(verified: appears in the quote below)_ - **EPM edition:** May 2026 _(verified: appears in the quote below)_ ## What the source says > 2035 | 12 | 20169 | Avista Corp | Electric Utility | Northeast (WA) | WA | 6210 | 1 | 45.0 | Natural Gas Fired Combustion Turbine | NG | GT | ## Source - https://www.eia.gov/electricity/monthly/epm_table_grapher.php?t=table_6_06 Last verified: 2026-08-11. Review by: 2026-09-20. Part of [Planned US generating-unit retirements: which plant and unit is scheduled to close, in which month, and what has been published before](https://referencesource.org/power-plant-retirement-schedule/).