# Mill Pond Hydro unit U2, NY — planned retirement, EIA data for June 2026 For Mill Pond Hydro unit U2, NY, planned retirement year is 2027; planned retirement month is 6; net summer capacity (mw) is 0.5; technology is Conventional Hydroelectric; fuel code is WAT; operator is Rivers Electric, LLC, verified against its source on 2026-09-24. - **Plant:** Mill Pond Hydro _(verified: appears in the quote below)_ - **EIA plant ID:** 65399 _(verified: appears in the quote below)_ - **Generator ID:** U2 _(verified: appears in the quote below)_ - **Planned retirement year:** 2027 _(verified: appears in the quote below)_ - **Planned retirement month:** 6 _(verified: appears in the quote below)_ - **Operator:** Rivers Electric, LLC _(verified: appears in the quote below)_ - **EIA entity ID:** 64726 _(verified: appears in the quote below)_ - **Producer type:** IPP _(verified: appears in the quote below)_ - **State:** NY _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 0.5 _(verified: appears in the quote below)_ - **Technology:** Conventional Hydroelectric _(verified: appears in the quote below)_ - **Fuel code:** WAT _(verified: appears in the quote below)_ - **Prime mover:** HY _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2027 | 6 | 64726 | Rivers Electric, LLC | IPP | Mill Pond Hydro | NY | 65399 | U2 | 0.5 | Conventional Hydroelectric | WAT | HY ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).