# Madero Grid unit MAD01, TX — planned retirement, EIA data for June 2026 For Madero Grid unit MAD01, TX, planned retirement year is 2042; planned retirement month is 6; net summer capacity (mw) is 100; technology is Batteries; fuel code is MWH; operator is Madero Grid, LLC, verified against its source on 2026-09-24. - **Plant:** Madero Grid _(verified: appears in the quote below)_ - **EIA plant ID:** 63757 _(verified: appears in the quote below)_ - **Generator ID:** MAD01 _(verified: appears in the quote below)_ - **Planned retirement year:** 2042 _(verified: appears in the quote below)_ - **Planned retirement month:** 6 _(verified: appears in the quote below)_ - **Operator:** Madero Grid, LLC _(verified: appears in the quote below)_ - **EIA entity ID:** 63451 _(verified: appears in the quote below)_ - **Producer type:** IPP _(verified: appears in the quote below)_ - **State:** TX _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 100 _(verified: appears in the quote below)_ - **Technology:** Batteries _(verified: appears in the quote below)_ - **Fuel code:** MWH _(verified: appears in the quote below)_ - **Prime mover:** BA _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2042 | 6 | 63451 | Madero Grid, LLC | IPP | Madero Grid | TX | 63757 | MAD01 | 100 | Batteries | MWH | BA ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).