# Saguaro Power unit CTG1, NV — planned retirement, EIA data for June 2026 For Saguaro Power unit CTG1, NV, planned retirement year is 2032; planned retirement month is 12; net summer capacity (mw) is 36; technology is Natural Gas Fired Combined Cycle; fuel code is NG; operator is Saguaro Power Co, verified against its source on 2026-09-24. - **Plant:** Saguaro Power _(verified: appears in the quote below)_ - **EIA plant ID:** 54271 _(verified: appears in the quote below)_ - **Generator ID:** CTG1 _(verified: appears in the quote below)_ - **Planned retirement year:** 2032 _(verified: appears in the quote below)_ - **Planned retirement month:** 12 _(verified: appears in the quote below)_ - **Operator:** Saguaro Power Co _(verified: appears in the quote below)_ - **EIA entity ID:** 16553 _(verified: appears in the quote below)_ - **Producer type:** Electric CHP _(verified: appears in the quote below)_ - **State:** NV _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 36 _(verified: appears in the quote below)_ - **Technology:** Natural Gas Fired Combined Cycle _(verified: appears in the quote below)_ - **Fuel code:** NG _(verified: appears in the quote below)_ - **Prime mover:** CT _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2032 | 12 | 16553 | Saguaro Power Co | Electric CHP | Saguaro Power | NV | 54271 | CTG1 | 36 | Natural Gas Fired Combined Cycle | NG | CT ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).