# Lawrence Energy Center unit 5, KS — planned retirement, EIA data for June 2026 For Lawrence Energy Center unit 5, KS, planned retirement year is 2032; net summer capacity (mw) is 382.2; technology is Conventional Steam Coal; fuel code is SUB; operator is Evergy Kansas Central, Inc, verified against its source on 2026-09-24. - **Plant:** Lawrence Energy Center _(verified: appears in the quote below)_ - **EIA plant ID:** 1250 _(verified: appears in the quote below)_ - **Generator ID:** 5 _(verified: appears in the quote below)_ - **Planned retirement year:** 2032 _(verified: appears in the quote below)_ - **Operator:** Evergy Kansas Central, Inc _(verified: appears in the quote below)_ - **EIA entity ID:** 22500 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** KS _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 382.2 _(verified: appears in the quote below)_ - **Technology:** Conventional Steam Coal _(verified: appears in the quote below)_ - **Fuel code:** SUB _(verified: appears in the quote below)_ - **Prime mover:** ST _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2032 | | 22500 | Evergy Kansas Central, Inc | Electric Utility | Lawrence Energy Center | KS | 1250 | 5 | 382.2 | Conventional Steam Coal | SUB | ST ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).