# Clifton unit 2, KS — planned retirement, EIA data for June 2026 For Clifton unit 2, KS, planned retirement year is 2028; planned retirement month is 6; net summer capacity (mw) is 2.5; technology is Petroleum Liquids; fuel code is DFO; operator is Sunflower Electric Power Corp, verified against its source on 2026-09-24. - **Plant:** Clifton _(verified: appears in the quote below)_ - **EIA plant ID:** 8037 _(verified: appears in the quote below)_ - **Generator ID:** 2 _(verified: appears in the quote below)_ - **Planned retirement year:** 2028 _(verified: appears in the quote below)_ - **Planned retirement month:** 6 _(verified: appears in the quote below)_ - **Operator:** Sunflower Electric Power Corp _(verified: appears in the quote below)_ - **EIA entity ID:** 18315 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** KS _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 2.5 _(verified: appears in the quote below)_ - **Technology:** Petroleum Liquids _(verified: appears in the quote below)_ - **Fuel code:** DFO _(verified: appears in the quote below)_ - **Prime mover:** IC _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2028 | 6 | 18315 | Sunflower Electric Power Corp | Electric Utility | Clifton | KS | 8037 | 2 | 2.5 | Petroleum Liquids | DFO | IC ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).