# Merrimack unit 2, NH — planned retirement, EIA data for June 2026 For Merrimack unit 2, NH, planned retirement year is 2028; planned retirement month is 5; net summer capacity (mw) is 330.5; technology is Conventional Steam Coal; fuel code is BIT; operator is Granite Shore Power, verified against its source on 2026-09-24. - **Plant:** Merrimack _(verified: appears in the quote below)_ - **EIA plant ID:** 2364 _(verified: appears in the quote below)_ - **Generator ID:** 2 _(verified: appears in the quote below)_ - **Planned retirement year:** 2028 _(verified: appears in the quote below)_ - **Planned retirement month:** 5 _(verified: appears in the quote below)_ - **Operator:** Granite Shore Power _(verified: appears in the quote below)_ - **EIA entity ID:** 62032 _(verified: appears in the quote below)_ - **Producer type:** IPP _(verified: appears in the quote below)_ - **State:** NH _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 330.5 _(verified: appears in the quote below)_ - **Technology:** Conventional Steam Coal _(verified: appears in the quote below)_ - **Fuel code:** BIT _(verified: appears in the quote below)_ - **Prime mover:** ST _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2028 | 5 | 62032 | Granite Shore Power | IPP | Merrimack | NH | 2364 | 2 | 330.5 | Conventional Steam Coal | BIT | ST ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).