# Northeast (WA) unit 1, WA — planned retirement, EIA data for June 2026 For Northeast (WA) unit 1, WA, planned retirement year is 2035; planned retirement month is 12; net summer capacity (mw) is 45; technology is Natural Gas Fired Combustion Turbine; fuel code is NG; operator is Avista Corp, verified against its source on 2026-09-24. - **Plant:** Northeast (WA) _(verified: appears in the quote below)_ - **EIA plant ID:** 6210 _(verified: appears in the quote below)_ - **Generator ID:** 1 _(verified: appears in the quote below)_ - **Planned retirement year:** 2035 _(verified: appears in the quote below)_ - **Planned retirement month:** 12 _(verified: appears in the quote below)_ - **Operator:** Avista Corp _(verified: appears in the quote below)_ - **EIA entity ID:** 20169 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** WA _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 45 _(verified: appears in the quote below)_ - **Technology:** Natural Gas Fired Combustion Turbine _(verified: appears in the quote below)_ - **Fuel code:** NG _(verified: appears in the quote below)_ - **Prime mover:** GT _(verified: appears in the quote below)_ - **EPM edition:** June 2026 _(verified: appears in its own passage below)_ ## What the source says > 2035 | 12 | 20169 | Avista Corp | Electric Utility | Northeast (WA) | WA | 6210 | 1 | 45 | Natural Gas Fired Combustion Turbine | NG | GT ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-June 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/august2026.zip Last verified: 2026-09-24. Review by: 2026-11-03. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).