# Macon unit 4, MO — planned retirement, EIA data for April 2026 For Macon unit 4, MO, planned retirement year is 2026; planned retirement month is 12; net summer capacity (mw) is 0.7; technology is Petroleum Liquids; fuel code is DFO; operator is City of Macon - (MO), verified against its source on 2026-10-16. - **Plant:** Macon _(verified: appears in the quote below)_ - **EIA plant ID:** 2141 _(verified: appears in the quote below)_ - **Generator ID:** 4 _(verified: appears in the quote below)_ - **Planned retirement year:** 2026 _(verified: appears in the quote below)_ - **Planned retirement month:** 12 _(verified: appears in the quote below)_ - **Operator:** City of Macon - (MO) _(verified: appears in the quote below)_ - **EIA entity ID:** 11460 _(verified: appears in the quote below)_ - **Producer type:** Electric Utility _(verified: appears in the quote below)_ - **State:** MO _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 0.7 _(verified: appears in the quote below)_ - **Technology:** Petroleum Liquids _(verified: appears in the quote below)_ - **Fuel code:** DFO _(verified: appears in the quote below)_ - **Prime mover:** IC _(verified: appears in the quote below)_ - **EPM edition:** April 2026 _(verified: appears in its own passage below)_ ## What the source says > 2026 12 11460 City of Macon - (MO) Electric Utility Macon MO 2141 4 0.7 Petroleum Liquids DFO IC ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-April 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/june2026.pdf Last verified: 2026-10-16. Review by: 2026-11-25. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).