# Notus Wind 1 unit 1, MA — planned retirement, EIA data for April 2026 For Notus Wind 1 unit 1, MA, planned retirement year is 2035; planned retirement month is 7; net summer capacity (mw) is 1.7; technology is Onshore Wind Turbine; fuel code is WND; operator is Notus Clean Energy LLC, verified against its source on 2026-10-16. - **Plant:** Notus Wind 1 _(verified: appears in the quote below)_ - **EIA plant ID:** 57414 _(verified: appears in the quote below)_ - **Generator ID:** 1 _(verified: appears in the quote below)_ - **Planned retirement year:** 2035 _(verified: appears in the quote below)_ - **Planned retirement month:** 7 _(verified: appears in the quote below)_ - **Operator:** Notus Clean Energy LLC _(verified: appears in the quote below)_ - **EIA entity ID:** 56742 _(verified: appears in the quote below)_ - **Producer type:** IPP _(verified: appears in the quote below)_ - **State:** MA _(verified: appears in the quote below)_ - **Net summer capacity (MW):** 1.7 _(verified: appears in the quote below)_ - **Technology:** Onshore Wind Turbine _(verified: appears in the quote below)_ - **Fuel code:** WND _(verified: appears in the quote below)_ - **Prime mover:** WT _(verified: appears in the quote below)_ - **EPM edition:** April 2026 _(verified: appears in its own passage below)_ ## What the source says > 2035 7 56742 Notus Clean Energy LLC IPP Notus Wind 1 MA 57414 1 1.7 Onshore Wind Turbine WND WT ## Where each value comes from This source states these in separate places, so each value is shown with the passage that states it. ### EPM edition > Table 1.1. Net Generation by Energy Source: Total (All Sectors), 2016-April 2026 ## Source - https://www.eia.gov/electricity/monthly/archive/june2026.pdf Last verified: 2026-10-16. Review by: 2026-11-25. Part of [Planned US generating-unit retirements, as EIA published them in one named month's Electric Power Monthly](https://referencesource.org/power-plant-retirement-schedule/).