# ISO/TR 21245-2:2016 — Withdrawn and superseded ISO standards For ISO/TR 21245-2:2016, item title is Railway applications — Rail project planning process — Part 2: Conditions; status code is 9599; successor is ISO/TR 21245:2018; withdrawn / published date is 2016-10-31, recorded from its source on 2026-08-05. - **Identifier:** ISO/TR 21245-2:2016 _(verified: appears in the quote below)_ - **Item title:** Railway applications — Rail project planning process — Part 2: Conditions _(verified: appears in the quote below)_ - **Status code:** 9599 _(verified: appears in the quote below)_ - **Successor:** ISO/TR 21245:2018 - **Withdrawn / published date:** 2016-10-31 _(verified: appears in the quote below)_ ## What the source says > 70251,TR,,ISO/TR 21245-2:2016,Railway applications — Rail project planning process — Part 2: Conditions,Applications ferroviaires - Processus de planification de projets ferroviaires — Partie 2: Conditions,2016-10-31,1,['45.020'],ISO/TC 269,9599,,[74012],['en'],5,"

ISO/TR 21245-2:2016 aims to identify basic conditions of rail projects, which are essential input for the design of rail systems. This document does not interfere with existing national and local laws, legal requirements and regulations. It considers only the 'planning stage' of rail projects and does not deal with the 'execution stage'. Any type of rail projects is intended to be dealt with, such as building a new line, retrofi ## Source - https://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv Last verified: 2026-08-05. Review by: 2027-02-01. Part of [Withdrawn and superseded ISO standards](https://referencesource.org/iso-standard-supersessions/).