# ISO/TR 21245-1:2016 — Withdrawn and superseded ISO standards For ISO/TR 21245-1:2016, item title is Railway applications — Rail project planning process — Part 1: Stakeholders and their needs/interests; status code is 9599; successor is ISO/TR 21245:2018; withdrawn / published date is 2016-11-14, recorded from its source on 2026-08-05. - **Identifier:** ISO/TR 21245-1:2016 _(verified: appears in the quote below)_ - **Item title:** Railway applications — Rail project planning process — Part 1: Stakeholders and their needs/interests _(verified: appears in the quote below)_ - **Status code:** 9599 _(verified: appears in the quote below)_ - **Successor:** ISO/TR 21245:2018 - **Withdrawn / published date:** 2016-11-14 _(verified: appears in the quote below)_ ## What the source says > 70230,TR,,ISO/TR 21245-1:2016,Railway applications — Rail project planning process — Part 1: Stakeholders and their needs/interests,Applications ferroviaires - Processus de planification de projets ferroviaires — Partie 1: Partie prenantes et leurs besoins/intérêts,2016-11-14,1,['45.020'],ISO/TC 269,9599,,[74012],['en'],18,"

ISO/TR 21245-1:2016 aims to identify typical stakeholders of rail projects and their generic needs/interests and does not interfere with existing national and local laws, legal requirements and regulations. It covers only the planning stage of rail projects and does not cover the execution stage. Any type of rail project is included (building a new line, retrofitting o ## Source - https://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv Last verified: 2026-08-05. Review by: 2027-02-01. Part of [Withdrawn and superseded ISO standards](https://referencesource.org/iso-standard-supersessions/).