# ISO 26910-1:2009 — Withdrawn and superseded ISO standards For ISO 26910-1:2009, item title is Springs — Shot peening — Part 1: General procedures; status code is 9599; successor is ISO 26910-1:2023; withdrawn / published date is 2009-06-08, recorded from its source on 2026-08-05. - **Identifier:** ISO 26910-1:2009 _(verified: appears in the quote below)_ - **Item title:** Springs — Shot peening — Part 1: General procedures _(verified: appears in the quote below)_ - **Status code:** 9599 _(verified: appears in the quote below)_ - **Successor:** ISO 26910-1:2023 - **Withdrawn / published date:** 2009-06-08 _(verified: appears in the quote below)_ ## What the source says > 43903,IS,,ISO 26910-1:2009,Springs — Shot peening — Part 1: General procedures,Ressorts — Grenaillage de précontrainte — Partie 1: Modes opératoires généraux,2009-06-08,1,['21.160'],ISO/TC 227,9599,,[87025],"['en','fr']",15,"
ISO 26910-1:2009 specifies general requirements for the shot peening process applied to springs in order to improve their resistance to fatigue and stress corrosion cracking, mainly by introducing compressive residual stresses into their surface layers.
" ## Source - https://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv Last verified: 2026-08-05. Review by: 2027-02-01. Part of [Withdrawn and superseded ISO standards](https://referencesource.org/iso-standard-supersessions/).