# ISO 14692-4:2002/Cor 1:2006 — Withdrawn and superseded ISO standards For ISO 14692-4:2002/Cor 1:2006, item title is Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 4: Fabrication, installation and operation — Technical Corrigendum 1; status code is 9599; successor is ISO 14692-4:2017 | ISO/NP 14692-4; withdrawn / published date is 2006-07-04, recorded from its source on 2026-08-05. - **Identifier:** ISO 14692-4:2002/Cor 1:2006 _(verified: appears in the quote below)_ - **Item title:** Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 4: Fabrication, installation and operation — Technical Corrigendum 1 _(verified: appears in the quote below)_ - **Status code:** 9599 _(verified: appears in the quote below)_ - **Successor:** ISO 14692-4:2017 | ISO/NP 14692-4 - **Withdrawn / published date:** 2006-07-04 _(verified: appears in the quote below)_ ## What the source says > 44477,IS,Cor,ISO 14692-4:2002/Cor 1:2006,"Petroleum and natural gas industries — Glass-reinforced plastics (GRP) piping — Part 4: Fabrication, installation and operation — Technical Corrigendum 1","Industries du pétrole et du gaz naturel — Canalisations en plastique renforcé de verre (PRV) — Partie 4: Construction, installation et mise en oeuvre — Rectificatif technique 1",2006-07-04,1,"['75.200','83.140.30']",ISO/TC 67/SC 6,9599,,"[62259,46539]","['en','ru']",2, ## Source - https://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv Last verified: 2026-08-05. Review by: 2027-02-01. Part of [Withdrawn and superseded ISO standards](https://referencesource.org/iso-standard-supersessions/).