# ISO 11119-3:2013 — Withdrawn and superseded ISO standards For ISO 11119-3:2013, item title is Gas cylinders — Refillable composite gas cylinders and tubes — Design, construction and testing — Part 3: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450L with non-load-sharing metallic or non-metallic liners; status code is 9599; successor is ISO 11119-3:2020; withdrawn / published date is 2013-04-17, recorded from its source on 2026-08-05. - **Identifier:** ISO 11119-3:2013 _(verified: appears in the quote below)_ - **Item title:** Gas cylinders — Refillable composite gas cylinders and tubes — Design, construction and testing — Part 3: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450L with non-load-sharing metallic or non-metallic liners _(verified: appears in the quote below)_ - **Status code:** 9599 _(verified: appears in the quote below)_ - **Successor:** ISO 11119-3:2020 - **Withdrawn / published date:** 2013-04-17 _(verified: appears in the quote below)_ ## What the source says > 50523,IS,,ISO 11119-3:2013,"Gas cylinders — Refillable composite gas cylinders and tubes — Design, construction and testing — Part 3: Fully wrapped fibre reinforced composite gas cylinders and tubes up to 450L with non-load-sharing metallic or non-metallic liners","Bouteilles à gaz — Bouteilles à gaz rechargeables en matériau composite et tubes — Conception, construction et essais — Partie 3: Bouteilles à gaz composites entièrement bobinées renforcées par des fibres et tubes d'une contenance allant jusqu'à 450 l avec liners métalliques ou non métalliques ne transmettant pas la charge",2013-04-17,2,['23.020.35'],ISO/TC 58/SC 3,9599,[27623],[75817],['en'],40,"
ISO 11119-3:2013 specifies requ ## Source - https://isopublicstorageprod.blob.core.windows.net/opendata/_latest/iso_deliverables_metadata/csv/iso_deliverables_metadata.csv Last verified: 2026-08-05. Review by: 2027-02-01. Part of [Withdrawn and superseded ISO standards](https://referencesource.org/iso-standard-supersessions/).