# Missouri โ€” Construction retainage limits by US state โ€” maximum withholding percentages, release deadlines, escrow requirements, and public vs private distinctions with statutory citations For Missouri, public project retainage cap (%) is 5%; private project retainage cap (%) is no statutory cap; release deadline is 30 days after acceptance and receipt of required documentation; escrow required is no; milestone reduction is public owner may reduce or eliminate retainage if work is proceeding satisfactorily, recorded from its source on 2026-08-17. - **State:** Missouri - **Public project retainage cap (%):** 5% - **Private project retainage cap (%):** no statutory cap - **Release deadline:** 30 days after acceptance and receipt of required documentation - **Escrow required:** no - **Milestone reduction:** public owner may reduce or eliminate retainage if work is proceeding satisfactorily - **Statutory citation:** RSMo ยง 34.057 _(our reading, not quoted from the source)_ ## What the source says > Retainage withheld on any construction contract or subcontract for public works projects shall not exceed five percent of the value of the contract or subcontract. ## Source - https://revisor.mo.gov/main/OneSection.aspx?bid=905&hl=§ion=34.057 Last verified: 2026-08-17. Review by: 2027-08-17. Part of [Construction retainage limits by US state โ€” maximum withholding percentages, release deadlines, escrow requirements, and public vs private distinctions with statutory citations](https://referencesource.org/construction-retainage-limits-by-state/).