# Minnesota — Asbestos Abatement Notification Requirements, Thresholds, and Fees by State For Minnesota, delegated authority is Minnesota Department of Health, Asbestos Program; notification trigger threshold is Friable ACM exceeding 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet; residential projects exceeding 10 linear feet, 6 square feet, or 1 cubic foot; advance notice days is five (5) calendar days; notification fee is $35 permit fee for residential projects with friable ACM less than 160 square feet; 3% of total project cost for all other notifiable projects; residential exemption is Residential projects with friable ACM below 6 square feet, 10 linear feet, or 1 cubic foot are not notifiable, recorded from its source on 2026-08-15. - **jurisdiction:** Minnesota _(our reading, not quoted from the source)_ - **delegated authority:** Minnesota Department of Health, Asbestos Program _(verified: appears in the quote below)_ - **notification trigger threshold:** Friable ACM exceeding 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet; residential projects exceeding 10 linear feet, 6 square feet, or 1 cubic foot _(verified: appears in the quote below)_ - **advance notice days:** five (5) calendar days _(verified: appears in the quote below)_ - **notification fee:** $35 permit fee for residential projects with friable ACM less than 160 square feet; 3% of total project cost for all other notifiable projects _(verified: appears in the quote below)_ - **residential exemption:** Residential projects with friable ACM below 6 square feet, 10 linear feet, or 1 cubic foot are not notifiable _(verified: appears in the quote below)_ - **emergency notification rules:** Contact MDH and MPCA as soon as possible to verify whether the project meets the requirements of an emergency project _(verified: appears in the quote below)_ - **statute or regulation citation:** Minnesota Statutes 326.71; Minnesota Rules 4620 _(our reading, not quoted from the source)_ ## What the source says > For non-residential or commercial projects (single projects, a series of small projects, and maintenance projects) where the quantity of friable ACM is greater than 160 square feet, 260 linear feet, or 35 cubic feet, the permit fee is 3%. ## Source - https://www.health.state.mn.us/communities/environment/asbestos/prof/notification.html Last verified: 2026-08-15. Review by: 2027-08-15. Part of [Asbestos Abatement Notification Requirements, Thresholds, and Fees by State](https://referencesource.org/asbestos-notification-requirements-by-state/).