# Connecticut — Asbestos Abatement Notification Requirements, Thresholds, and Fees by State For Connecticut, delegated authority is Connecticut Department of Public Health, Asbestos Program; notification trigger threshold is All asbestos abatement projects require notification; all demolitions require notification even if no asbestos is present; advance notice days is at least ten (10) days; notification fee is $100.00 for abatement less than 160 square feet; $100.00 plus one percent (multiply cost by 0.01) of the total abatement cost (excluding cost to reinsulate) up to a maximum fee of $5,000.00 for abatement of 160 square feet or greater; $50.00 for demolition notification; $200.00 for alternative work practice application; residential exemption is No specific residential exemption stated in state notification fee schedule; follows federal NESHAP exemption, recorded from its source on 2026-08-15. - **jurisdiction:** Connecticut _(our reading, not quoted from the source)_ - **delegated authority:** Connecticut Department of Public Health, Asbestos Program _(verified: appears in the quote below)_ - **notification trigger threshold:** All asbestos abatement projects require notification; all demolitions require notification even if no asbestos is present _(verified: appears in the quote below)_ - **advance notice days:** at least ten (10) days _(verified: appears in the quote below)_ - **notification fee:** $100.00 for abatement less than 160 square feet; $100.00 plus one percent (multiply cost by 0.01) of the total abatement cost (excluding cost to reinsulate) up to a maximum fee of $5,000.00 for abatement of 160 square feet or greater; $50.00 for demolition notification; $200.00 for alternative work practice application _(verified: appears in the quote below)_ - **residential exemption:** No specific residential exemption stated in state notification fee schedule; follows federal NESHAP exemption _(verified: appears in the quote below)_ - **emergency notification rules:** An Emergency notification must be filed within one (1) working day. Contractors should discuss with program staff before proceeding with an emergency filing unless the facility poses an imminent risk of harming the public. _(verified: appears in the quote below)_ - **statute or regulation citation:** Connecticut Department of Public Health Asbestos Program notification requirements _(our reading, not quoted from the source)_ ## What the source says > An initial asbestos notification must be post marked, or hand delivered at least ten (10) days prior to the start of asbestos abatement. ## Source - https://portal.ct.gov/dph/asbestos-program/asbestos-program/asbestos-related-notification-fees Last verified: 2026-08-15. Review by: 2027-08-15. Part of [Asbestos Abatement Notification Requirements, Thresholds, and Fees by State](https://referencesource.org/asbestos-notification-requirements-by-state/).